Project
Features:
• 850,000 square
foot distribution center on a
 146.52-acre
site
• future expansion to 1,700,000 square foot
• site was originally the Firestone Plant and considered
a
 "brownfield
site"
• located within Chesapeake Bay Critical Area
• Phase I completed: 2002
Services Provided:
• initial site development
plans and environmental assessment
 for proposed
development
• site development engineering design
• topographic and boundary surveys
• wetland delineation
• forest stand delineation
• endangered species survey
• internal private access road and extension of a
 State
highway
• storm drains, water mains, sanitary force main and
 pump
house
• permitting assistance
|